Caulfield Medical Centre Stages 1&2

Approx. Mech. Value: $7,600,000.00

Builder: Kane Constructions

Services Consultant: Bassett

Expected Completion Date: June 2010

Caulfield stage 1 smaller

Stage 1, Logistics facility at Caulfield General Medical Centre incorporates a new Finishing Kitchen and Support Services, including Engineering, Biomedical Engineering as well as providing a location for central plant and Substation to support the future Redevelopment. The Finishing Kitchen caters for 3 meals per day for 550 patients. And is future proofed to provide an additional 600 meals per day when required.

 Stage consists of:

  • 2 Chillers
  • 2 Forced Draft Heating Hot Water Boilers
  • 4 CHW Pumps
  • 10 HHW Pumps
  • 7 Air Handling Units
  • 16 Fan Coil Units
  • 8 Heat Reclaim Coils
  • 23 Fans
  • 8 Cool Rooms
  • 4 Kitchen Hoods
  • Medical Gases System
  • Complete Building Management System

Caulfield stage 2 smaller

Stage 2 links the Logistics Building with the existing hospital creating a new wing for Rehabilitation with Hyrotherapy pools, Palliative and aged care centres and Administration facilities. The stage involves the refurbishment of part of the existing Hospital with a large extension to the North East and link bridge to the Logistics building.

Stage consists of:

  • 2 Chillers
  • 9 Air Handling Units
  • 2 CRAC units
  • 2 Package units
  • 56 Ducted Fan Coil Units
  • 45 Wall Mounted Fan Coil Units
  • 27 Fans
  • 2 Kitchen Hoods
  • 5 Pumps
  • 6 Heating/Cooling Coils
  • Medical Gases System
  • Complete Building Management System

 

Other Healthcare Works:

  • Frankston Hospital - Stage 2
  • Latrobe Health
  • Mental Health
  • St Vincents Hospital
  • Royal Melbourne Hospital
  • Besthesda Hospital
  • Royal Womens Hospital - Oncology
  • Box Hill Hospital - pakage 4&5
  • Epworth Hospital - Cardiac level 4
  • Maroondah Hospital - Stage 2A
  • Lillydale Superclinic
  • Ludwig Institute - Austin Hospital
  • Kingston Kitchen